Logistics & Supply Chain

Streamlining Dispatch for a Regional Logistics Provider

A dedicated 24/7 dispatch and routing team replaced manual scheduling, eliminating bottlenecks and cutting delivery delays across 120+ active routes.

Streamlining dispatch for a regional logistics provider

About the Client

As the client scaled dispatch and distribution operations, manual routing, paper-based manifests, and legacy dispatch boards created severe delivery bottlenecks and customer dissatisfaction.

  • Regional Multi-Hub Footprint: Operating 120+ active routes across multiple distribution centers.

  • High-Volume Daily Dispatch: Managing thousands of time-sensitive last-mile deliveries every week.

  • 24/7 Operational Demands: Required continuous coordination between warehouse teams, drivers, and customers.

  • Rapid Fleet Expansion: Growing delivery volume outpaced legacy spreadsheet-based scheduling.

The Challenge

Scattered spreadsheets and manual calls caused delivery bottlenecks.

  • Trajectory gap in routing: Dispatchers lacked real-time visibility into driver locations and live route traffic.

  • Manual scheduling bottlenecks: Over 120+ active routes managed via spreadsheets and phone calls.

  • Customer delivery delays: Inconsistent delivery timeframes and lack of automated alerts.

  • High operational overhead: High dispatcher burnout and rising last-mile delivery costs.

The Solution

We embedded a dedicated 24/7 dispatch and routing team equipped with automated TMS workflows and real-time driver telemetry.

These focus on:

  • Process Assessment: Audited existing dispatch procedures and identified critical handoff failure points.

  • Dedicated 24/7 Team: Deployed a dedicated team trained on modern TMS platforms and GPS dispatch tools.

  • Automated Routing: Implemented dynamic multi-stop route optimization algorithms and live driver tracking.

Quantifiable Outcomes

MetricBefore NaxapeAfter Naxape
Dispatch Turnaround4.5 hours45 mins (83% faster)
On-Time Delivery SLA84.5%99.2% (+14.7% gain)
Dispatcher Overtime32 hrs/wk18.8 hrs/wk (41% reduction)

38%

Faster Execution

Faster Execution

99.2%

On-Time Rate

On-Time Rate

41%

Lower Overtime

Lower Overtime

The Challenge

Operational Complexity at Scale

Scattered spreadsheets and manual calls caused delivery bottlenecks.

Trajectory gap in routing

Trajectory gap in routing

Dispatchers lacked real-time visibility into driver locations and live route traffic.

Manual scheduling bottlenecks

Manual scheduling bottlenecks

Over 120+ active routes managed via spreadsheets and phone calls.

Customer delivery delays

Customer delivery delays

Inconsistent delivery timeframes and lack of automated alerts.

High operational overhead

High operational overhead

High dispatcher burnout and rising last-mile delivery costs.

Streamlining dispatch for a regional logistics provider | Naxape